Sign In | Join Free | My himfr.com
Home > Galvanized Steel Pole >

Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange

Jiangsu Baojuhe Science and Technology Co.,Ltd
Contact Now
    Buy cheap Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange from wholesalers
     
    Buy cheap Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange from wholesalers
    • Buy cheap Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange from wholesalers
    • Buy cheap Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange from wholesalers
    • Buy cheap Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange from wholesalers

    Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange

    Ask Lasest Price
    Brand Name : JSBS
    Model Number : BS-1
    Certification : ISO9001:2008
    Price : USD 50-500 per piece
    Payment Terms : T/T, L/C
    Supply Ability : 200 pieces per day
    Delivery Time : within 15 working days
    • Product Details
    • Company Profile

    Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange

    Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange


    Description:

    Electric steel poles have been a new kind of equipment for erecting power lines in recent years. They are replacing the traditional concrete electric poles step by step. With the advanced equipment for processing of steel tube towers, the factory produces steel structures mainly focusing on equal-diameter tubes and cone-shaped tubes in polygon and round shape. These products enjoy stable and reliable quality.


    Material

    Normally Q235B/A36, Yield Strength235MPa

    Q345B/A572, Yield Strength345MPa

    Power Capacity10kV ,13.8kV,69kV,110kV,132kV,220kV or other
    Tolerance of the dimensionAccording to client’s requirement
    Surface treatmentHot-dip-galvanized following ASTM123, or any other standard by client’s requirement
    StandardISO9001:2008
    Production ProcessRaw material test-Angle Marking -Hole Drilling-Angle Cutting-Angle Shovelling- Angle Fring –Angle Welding-Sample Assemble-Surface Clean-Galvanization -Recalibration-Packages
    Packages

    packing by bundles(set-wise or member-wise)with weight of 2~3 tons or according to client’s requirement


    Manufacturing Process

    →Raw material test (We buy the raw materials from famous mill factory here in China. We'll check the elements of the raw material like silicon, carbon, sulfur etc. in our lab test room. If they are unqualified, we'll return them. In this way, we can control the quality from the first beginning.)


    → Cutting


    →Bending (imported 1600Tons Hydraulic Bending Machine)


    →Welding (longitudinal penetration rate over 95%)


    →Dimension verify

    →Flange welding

    →Hole drilling

    →sample assemble

    → surface clean

    → Galvanization or powder coating ,painting

    →Recalibration

    →Packages


    We buy the raw material from famous mill factory here in China. We'll check the elements of the raw material like silicon, carbon, sulfur etc. in our lab test room. If they are unqualified, we'll return them. In this way, we can control the quality from the first beginning.


    Our factory owns advanced production lines and machines including bending calibration machine, hydraulic plate shears machine, shears machine, slitting machine, 208T hydraulic straightener, etc. All insure us to produce steel poles with best quality.

    After the fabrication process as cutting plate, bending, forming, automatic welding, drilling holes, we get poles checked before galvanized, hot dip galvanized and powder coating and finally we get poles checked according to client's requirements.



    FAQ

    1. Price Term: EXW, FOB, CFR or CIF.

    • The price includes pole shaft, base plate, crossarm, and anchor bolt.

    • Shipping seaport: Shanghai Seaport.

    • Please provide drawings if you have so that we can calculate the accurate price for you.

    • We also provide design according to your requests, if you don't have drawings.

    2. MOQ: One 40FT Container.

    3. Payment Term: Typically 30% by T/T as a deposit, balance by T/T or L/C at sight before shipment. Other payment ways can be negotiated.

    4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.

    5. Package: Normally wrapped by plastical bags or burlap cloth at the top and bottom, or according to clients requirement.
    Quality Hot Dip Galvanized Steel Electrical Substation Structure Pole with Flange for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jiangsu Baojuhe Science and Technology Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)